06 Dec LIQUID STORING SYSTEMS INSTALLATION STAGES
By laying out ground covers: Water tank,placed to the center of covers according to the valve being used.
Installation kit located in the upper and lower PVC cover and PVC valve is mounted to the throat.
Valve and cap are mounted to filling and drain point of water tank then closed strongly. Water tank is ready for use with all components under favour of easy installation.